| Bid Classification: |
Construction
|
|---|---|
| Bid Type: | RFQ - Request for Quotation - Low Bid |
| Bid Number: | 26-15 |
| Bid Name: | Division Street Reconstruction - Trenton, ON |
| Bid Status: | Open |
| Published Date: | Thu May 14, 2026 2:35:00 PM (EDT) |
| Bid Closing Date: | Thu Jun 25, 2026 2:00:00 PM (EDT) |
| Question Deadline: | Thu Jun 4, 2026 12:00:00 PM (EDT) |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
The work involves the supply of all labour, equipment, and materials for completing the full reconstruction of Division Street. The work items include: traffic control, the removal of the existing watermain and the installation of new watermain including its services and all appurtenances, removal and installation of sanitary trunk sewer and its services, removal and replacement of existing storm sewers, the removal and replacement of concrete curb and sidewalk, full depth asphalt removal, road base excavation, tree removal, topsoil and sod, supply and placement of Type II Limestone Granular A & B, hot mix asphalt paving, line painting, installation of multiple utility conduits (joint utility trench), and rock excavation. There will be miscellaneous landscaping work to be done throughout the site as shown in forthcoming landscaping plans. There will be streetlighting work to be done throughout the site as shown in forthcoming streetlight/utility plans. This project will require coordination with Bell Canada, Cogeco, Enbridge Gas and Hydro One who will also be present during construction to relocate their respective utilities along Division Street as/when required. Multiple underground/overhead utilities will be relocated into the joint utility trench throughout the site such as: Bell(UG/OH), Cogeco(OH), HydroOne(OH) and Enbridge Gas Mains. Commencement of work will be July 20, 2026 and with substantial completion of Phase 1 on or before November 6, 2026 with final completion on or before November 27, 2026. Phase 2 will not be able to commence prior to base asphalt paving of Phase 1 is completed and must be substantially completed (Base Asphalt placed) prior to November 27, 2026. Surface Asphalt in both Phase 1 and 2 will be permitted to be completed in the Spring of 2027 along with all work included in the forthcoming Landscaping Section. Refer to appendices for further details. |
| Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity (available if you don't have an active subscription). |